University of Central Arkansas Campus Drainage Improvements

The existing storm drainage system along Sowder Drive in Conway had deteriorated to the point that it had to be replaced and upgraded to alleviate flooding issues on the north end of the campus. Crafton Tull performed the hydraulic analysis, prepared the preliminary cost estimates for improvements, designed the improvements and handled the construction administration.